ADEME: DECARB FLASH 2025-2027
Fund decarbonisation investments on industrial sites quickly.
At a glance
- Programme
- France 2030: DECARB FLASH 2025-2027
- Territory
- France
- Beneficiaries
- Industrial SMEs; large companies under conditions, notably outside the EU ETS
- Type of aid
- Grant
- Amount / rate
- Total project of €100k to €3 million in eligible costs, with an adjusted threshold in Corsica/overseas; rate depends on action and size
- Availability
- 15 October 2026 cut-off date passed; final closing date 15 February 2027
Information up to date as of 6 November 2026, valid until 15 February 2027. Scheme conditions change: check with the funding body or ask us for confirmation.
DECARB FLASH funds industrial decarbonisation investments that are more standardised and quicker to appraise than major calls for projects. It targets practical actions in energy efficiency, heat recovery, changes to the energy mix or reduced fossil fuel use.
Which projects are funded?
Projects may combine several actions: heat recovery, energy efficiency, changes to the energy mix, insulation of industrial buildings or replacement of fossil fuels with renewable solutions. The total cost of the project must fall within the range set by ADEME.
Who can apply?
- SMEs carrying out an industrial activity on the site concerned, including certain sites subject to the EU Emissions Trading System (EU ETS) under the rules of the call.
- Large companies only in the configurations provided for by the scheme, notably for sites not subject to the EU ETS.
- Industrial sites located in mainland France or in the overseas territories covered by the call.
Which costs are eligible?
- Energy efficiency and heat recovery equipment.
- Investments to reduce or replace fossil energy consumption.
- Insulation or energy upgrading of industrial buildings where it corresponds to eligible actions.
- Equipment for producing or using renewable energy included in the list of eligible actions.
How much funding is available?
The aid is a grant. The rate depends on the size of the company, the nature of the action and the applicable aid scheme. The total project cost base is between €100k and €3 million in the general case, with an adjusted minimum threshold in Corsica and the overseas territories.
A prior discussion with ADEME is mandatory before submission. In particular, it serves to validate the eligibility of the actions and the positioning of the project.
Main selection criteria
- Measurable reduction in energy consumption or greenhouse gas emissions.
- Eligibility of the actions under the scheme's technical list.
- Ratio between project cost and energy or carbon gains.
- Maturity of the investments, quotes and implementation timetable.
- The company's ability to finance and operate the equipment.
Points to watch
- The prior meeting with ADEME is mandatory: it must be scheduled well ahead of the cut-off date.
- The list of eligible actions may change; check the version applicable at the time of submission.
- Do not commit to expenditure that makes the project irreversible before securing eligibility for the aid.
- The application must quantify consumption and emissions before/after, not just describe the equipment.
The CHOICE view
DECARB FLASH is suited to industrial projects that are already mature, with identified equipment and calculable energy gains. For CHOICE, the challenge is less about building a complex narrative than about making the technical data, the cost base and the timetable reliable, in order to produce an application that is simple, consistent and ready for immediate appraisal.
How to prepare your project
- Schedule the mandatory prior discussion with ADEME promptly.
- Establish the baseline energy situation and the gains per action.
- Check the eligibility of each piece of equipment against the current list.
- Gather quotes, technical data sheets and the implementation timetable.
- Build the financing plan and check the incentive effect of the aid.
Official sources
The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.
How CHOICE works on this kind of application
Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.
- Our approach Improve and de-risk the project before financing it.
- Our services Assessment, business plan, preparing and filing the application, representation, follow-up.
- Our references More than 130 projects supported over ten years, and the firm's accreditations.
- 4 questions before submitting Also worth reading in our publications.
- All funding schemes The full catalogue, with conditions and deadlines.