ADEME: Supply equipment for wood-fired boiler plants

Structure the production, storage and preparation of biomass fuels.

Status
Open
Next deadline
31 December 2026
Operator
ADEME

At a glance

Programme
Fonds Chaleur / Plan de relance / France 2030
Territory
All regions, with regional priorities
Beneficiaries
Wood-energy sector companies, local authorities and associations
Type of aid
Investment grant
Amount / rate
Rate depending on equipment and eligible costs; up to 55% for some categories, regional caps possible
Availability
Open until 31 December 2026; each regional office may prioritise or cap

Information up to date as of 24 August 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

This scheme funds equipment that secures the supply chain for biomass boilers supported by the Fonds Chaleur (the French Heat Fund), the Plan de relance (the French recovery plan) or France 2030. It targets fuel quality, storage, preparation and the mobilisation of energy biomass.

Which projects are funded?

Eligible projects include the creation or fitting-out of supply platforms, fuel preparation and sorting equipment, certain forestry or hedgerow harvesting machinery, as well as sheds and drying equipment for log wood. The project must demonstrate its link with the supply of boiler plants supported by the public schemes concerned.

Who can apply?

  • Forestry works contractors, forest or hedgerow operators and biomass platform operators.
  • Cooperatives and other wood-energy sector organisations meeting the conditions of the aid.
  • Local authorities and associations carrying eligible supply infrastructure.

Which costs are eligible?

  • Creation or fitting-out of eligible platforms, storage areas and sheds.
  • Shredders, screens, weighing equipment, moisture measurement and fuel sorting.
  • Certain forestry or hedgerow harvesting equipment directly linked to the production of energy wood.
  • Artificial drying equipment for log wood running on renewable or recovered energy.

How much funding is available?

The amount is calculated by applying an aid rate to eligible costs. Depending on the category, rates can reach 55%, but ADEME (the French Agency for Ecological Transition) generally recommends that total public aid remain below 50% of the eligible investment for certain equipment.

Regional offices may set specific caps or not open certain categories, depending on their priorities. The rate should therefore be confirmed before contracting the investments.

Main selection criteria

  • Recent territorial assessment demonstrating the need for the equipment.
  • Concrete link with the supply of Fonds Chaleur, Plan de relance or France 2030 boiler plants.
  • Pooling and satisfactory utilisation rate of the equipment.
  • Sustainable management certification and fuel quality.
  • Real increase in biomass mobilisation capacity, beyond a simple equipment replacement.

Points to watch

  • A simple equipment replacement is not the target; an increase in capacity or performance must be demonstrated.
  • The independent territorial assessment is a key document.
  • Contracts securing outlets to the funded boiler plants are strongly expected.
  • Rules and caps may vary between ADEME regional offices.

The CHOICE view

The aid funds sector infrastructure, not just a machine. CHOICE must show why the equipment is currently lacking in the area, what additional volume it will mobilise and which boiler plants will secure the outlets. The best application rests on contracts and utilisation rates, not on a list of quotes.

How to prepare your project

  • Commission or update the territorial assessment of existing capacity.
  • Quantify the additional biomass volumes to be mobilised.
  • Secure contracts with the boiler plants or their suppliers.
  • Document sustainable management certifications and fuel quality.
  • Confirm with the regional office the investment categories and applicable caps.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.