ADEME: Extending or creating heating or cooling networks

Fund the distribution of renewable or recovered heating and cooling.

Status
Open
Next deadline
31 December 2026
Operator
ADEME

At a glance

Programme
Fonds Chaleur 2026
Territory
All regions
Beneficiaries
Companies and local authorities
Type of aid
Investment grant
Amount / rate
Flat-rate aid or economic analysis depending on the project; no single national cap published
Availability
From 1 January to 31 December 2026

Information up to date as of 24 August 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

The Fonds Chaleur (the French Heat Fund) supports the creation or extension of networks distributing heating or cooling from renewable and recovered energy sources. The aid targets the distribution function: it complements the aid available for the heat production itself.

Which projects are funded?

Creation of a network or significant extension of an existing network connected to renewable and recovered energy (EnR&R) production: biomass, solar thermal, geothermal energy, anaerobic digestion, waste heat recovery or other sources accepted under the Fonds Chaleur rules. The project must meet technical criteria relating in particular to the share of EnR&R, energy density and additional production.

Who can apply?

  • Companies acting as project owners of an eligible network.
  • Local authorities and public bodies, where the network is part of a public heat distribution service.
  • The network must have at least two customers separate from the project owner where this condition applies.

Which costs are eligible?

  • Pipes and structures needed to distribute heating or cooling.
  • Substations, hydraulic equipment, controls and instrumentation directly associated with the network.
  • Civil engineering works and connections included in the Fonds Chaleur cost base.
  • Heat production or recovery falls under dedicated aid sheets and is not confused with network aid.

How much funding is available?

The amount is calculated either on a flat-rate basis or from an economic analysis, depending on the characteristics of the network and of the installation to which it is connected. There is no single national cap displayed on the 2026 page.

For networks of significant size, the aid may exceed €90k. The final amount nevertheless depends on the cost base accepted, the project's performance, other public aid and the demonstrated need.

Main selection criteria

  • Share of renewable and recovered energy in the network mix.
  • Energy density and consistency of the route with the connected needs.
  • Additional EnR&R production actually mobilised.
  • Technical, economic and contractual robustness of the network.
  • Consistency with the other public funding sought.

Points to watch

  • Do not mix production aid and distribution aid in the financing plan.
  • Secure connections and commitments from future subscribers before submitting.
  • Contact the regional office of ADEME (the French Agency for Ecological Transition) early: assessment is highly territorial.
  • Do not commit expenditure before securing eligibility and the incentive effect of the aid.

The CHOICE view

The scheme becomes particularly attractive when the network brings together several consumers around an already identified EnR&R source. The quality of the application rests less on an announcement effect than on demonstrating a network that is actually used: secured subscribers, load curve, density, heat price and economic trajectory must be consistent.

How to prepare your project

  • Map subscribers' needs, capacities and consumption profiles.
  • Secure letters of commitment or connection contracts where possible.
  • Define the route, losses, energy density and operating assumptions.
  • Build the network's economic model with and without aid.
  • Align the network application with the aid application for the EnR&R production unit.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.