← All publications

Funding schemes

ADEME: Solar thermal feasibility study

Fund a feasibility study before investing in a solar thermal installation.

Status
Open
Next deadline
31 December 2026
Operator
ADEME

At a glance

Programme
Fonds Chaleur (ADEME): feasibility study for a solar thermal installation
Territory
Twelve regions of mainland France, Guadeloupe, French Guiana, Réunion, Martinique and Mayotte; Corsica, French Polynesia and Saint Pierre and Miquelon depending on the source
Beneficiaries
Companies of all sizes and in all sectors, micro-enterprises included, regardless of company age; municipalities, intermunicipal bodies, departments, public institutions
Type of aid
Technical engineering grant for a study, formalised in an ADEME funding contract
Amount / rate
Up to 70% of the cost of the study, with a maximum of €100,000; rates by size to be confirmed
Availability
Available until 31 December 2026; application after creating an ADEME account, before any commitment

Information up to date as of 14 November 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

ADEME (the French Agency for Ecological Transition), with the Fonds Chaleur (the French Heat Fund), funds the feasibility study that precedes a solar thermal installation project: the study checks the technical and economic feasibility of the installation, establishes its sizing and explores its financing and structuring. The aid can reach 70% of the cost of the study, with a maximum of €100,000, and the scheme is available until 31 December 2026.

Which projects are funded?

The scheme funds a feasibility study prior to a solar thermal project, for example to produce hot water on site. The study may cover the implementation of:

  • dedicated installations on buildings or processes;
  • installations on heating networks;
  • combined solar systems.

ADEME provides terms of reference templates according to the technologies used. The study must make it possible to:

  • check the technical and economic feasibility of the project to set up a solar installation;
  • propose technical solutions adapted to the context and possibilities of the installation site, and ensure the sizing and long-term durability of the installation;
  • explore solutions for financing the operation and for its administrative and legal structuring.

Who can apply?

According to the public Transition écologique des entreprises portal (a French government portal), the scheme is aimed at companies:

  • of all sizes, micro-enterprises included;
  • in all business sectors;
  • regardless of company age;
  • located in one of the following regions: Auvergne-Rhône-Alpes, Bourgogne-Franche-Comté, Brittany, Centre-Val de Loire, Grand Est, Guadeloupe, French Guiana, Hauts-de-France, Île-de-France, Réunion, Martinique, Mayotte, Normandy, Nouvelle-Aquitaine, Occitanie, Pays de la Loire, French Polynesia, Provence-Alpes-Côte d'Azur, Saint Pierre and Miquelon.

The portal also indicates that it is open to public administrations. Aides-territoires (the government's aid platform for local areas), for its part, lists only public sector beneficiaries: municipalities, intermunicipal bodies and pays (groupings of rural municipalities), departments, public institutions (including State services) and local public companies (Sem, Spl, SemOp). Its list of regions also differs: it includes Corsica, but neither French Polynesia nor Saint Pierre and Miquelon.

In all cases, the operation must not have started or have given rise to firm commitments, in any form whatsoever (signed contract, signed order, accepted quote, etc.).

Which costs are eligible?

The aid covers the cost of the feasibility study. It is conditional on using a service provider whose skills meet a standard validated by ADEME (RGE Études, the "Reconnu Garant de l'Environnement" label for engineering and study firms) or who can demonstrate equivalent conditions; the list of RGE Études professionals is available on ADEME's Open data portal.

The detail of eligible costs is to be confirmed in the ADEME document "Études en faveur de la transition écologique : conditions d'éligibilité et de financement 2026" (studies for the ecological transition: 2026 eligibility and funding conditions), to which the portal refers.

How much funding is available?

The aid is a grant, which the Aides-territoires platform classifies as technical engineering. It covers up to 70% of the cost of the study, with a maximum of €100,000. The sources consulted give no rate by company size or type of beneficiary: the rate applicable to a given application is to be confirmed in the 2026 eligibility and funding conditions.

If the application is accepted, ADEME sends a funding contract specifying the maximum aid amount, the conditions and the payment arrangements.

Main selection criteria

The sources consulted do not publish a selection grid: ADEME examines each application. At a minimum, the application must show:

  • the administrative information, the project description and its technical and financial details;
  • an operation that has not started and has not given rise to any firm commitment;
  • the use of an RGE Études service provider or one demonstrating equivalent conditions;
  • a location in one of the regions covered.

According to Aides-territoires, ADEME also invites project holders to adopt an "EnR'Choix" type approach (a method for choosing between renewable options), which favours sufficiency, the pooling of production resources and the use of certain renewable and recovered energies. Before making a renewable or recovered heat investment, the project holder will have to demonstrate that it has taken into account:

  • reducing needs, through sufficiency and energy efficiency measures on buildings or processes;
  • pooling needs: connection to an existing environmentally sound heating network where possible, or a study of the potential for creating a heating network;
  • recovering the waste heat available locally;
  • the other renewable energies available locally, including geothermal energy and solar thermal.

Points to watch

  • Commit to nothing before applying: an accepted quote, a signed order or a signed contract make the operation ineligible.
  • The aid is conditional on choosing an RGE Études service provider or one demonstrating equivalent conditions: check this before asking it for a quote.
  • The two sources differ on beneficiaries: Aides-territoires cites only public entities and local public companies, while the Transition écologique des entreprises portal opens the aid to companies of all sizes. A private company would be well advised to have its eligibility confirmed by ADEME before applying.
  • They also differ on territory: Corsica appears on Aides-territoires but not on the portal, which lists a separate scheme for it, an opportunity study for a collective solar thermal installation; French Polynesia and Saint Pierre and Miquelon appear on the portal but not on Aides-territoires. For a site in one of these territories, eligibility is to be confirmed with ADEME.
  • The wording "up to 70% of the cost of the study, with a maximum of €100,000" does not specify whether the ceiling applies to the aid or to the cost of the study, and the rate by size is not published: to be confirmed with ADEME.
  • The scheme is announced as available until 31 December 2026; the sources consulted say nothing about a renewal in 2027.
  • Not to be confused with the opportunity study for renewable and recovered energy, another ADEME factsheet in the catalogue, which compares upstream all the renewable heating and cooling resources of an existing building and is listed neither in Brittany, Centre-Val de Loire, Pays de la Loire, Guadeloupe nor French Guiana, whereas the feasibility study concerns a solar thermal project already envisaged and covers these five territories.
  • The aid funds the study, not the installation: the investment falls under Fonds Chaleur aid, including "Solar thermal hot water production" and "Combined solar system installations", also in the catalogue.
  • For an existing collective solar thermal installation that is faulty or unproductive, the portal lists another ADEME study, dedicated to its rehabilitation.

The CHOICE view

This scheme suits a company or a local authority that is already considering solar thermal for a building, a process or a heating network, and needs to establish its feasibility before deciding to invest. If the renewable resource has not yet been chosen, the opportunity study, where it is open, comes further upstream. For CHOICE, three points need securing: confirm the eligibility of the project holder and of the territory, given the discrepancies between the sources; select an RGE Études service provider and apply before 31 December 2026 without having accepted its quote; frame the study so that it produces a sizing and a financing plan directly useful for the investment aid application. The aid is never guaranteed.

How to prepare your project

  • Check that the site is located in one of the listed regions and, for a private company as for a territory where the sources differ, have eligibility confirmed by ADEME.
  • Consult ADEME's 2026 eligibility and funding conditions, or contact an adviser.
  • Choose an RGE Études service provider, or one demonstrating equivalent conditions, and obtain its quote without accepting it before applying.
  • Use the ADEME terms of reference template corresponding to the technology envisaged: dedicated installation on a building or process, installation on a heating network, combined solar system.
  • Document the "EnR'Choix" approach from the study stage onwards (reducing needs, pooling, waste heat, other local renewable energies), which ADEME will ask you to demonstrate before the investment.
  • Create an ADEME account, then submit the application (administrative information, project description, technical and financial details) before 31 December 2026 and before any start.
  • Once the funding contract has been received, carry out the study; if it supports the project, prepare the Fonds Chaleur investment aid application.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.