ADEME: Heat installations using deep geothermal energy
Harness a deep geothermal resource to produce stable renewable heat.
At a glance
- Programme
- Fonds Chaleur
- Territory
- All regions
- Beneficiaries
- Companies, local authorities, public institutions and associations
- Type of aid
- Investment grant
- Amount / rate
- Amount based on output, eligible costs and techno-economic analysis; no single national cap displayed
- Availability
- Rolling until 31 December 2026
Information up to date as of 24 August 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.
ADEME (the French Agency for Ecological Transition) funds deep aquifer geothermal operations, with or without a heat pump and possibly combined with a heating network. This resource provides renewable output that is continuously available, but requires thorough control of subsurface risk and of surface sizing.
Which projects are funded?
The scheme covers deep geothermal operations, in particular on low-energy aquifers, intended to supply buildings, processes or a heating network. Projects may include heat pumps depending on the temperature of the resource.
Who can apply?
- Companies with significant thermal needs or developing a network project.
- Local authorities, public institutions and associations.
- The project holder must have subsurface and surface studies suited to the project's level of maturity.
Which costs are eligible?
- Production and reinjection wells and wellhead equipment.
- Exchangers, pumps, production equipment and auxiliaries.
- Connection to heating networks or consuming installations where eligible.
- Surface works and instrumentation directly linked to geothermal operation.
How much funding is available?
The Fonds Chaleur (the French Heat Fund) calculates the aid according to the technical and economic characteristics of the operation, in particular the quantity of heat produced and the performance of the system.
No single national cap is displayed on the scheme page. Deep geothermal projects, which are often capital-intensive, may receive aid far above €90k.
Main selection criteria
- Quality of geological, hydrogeological and thermal studies.
- Level of risk on the resource and control of drilling.
- Quantity of renewable heat produced and rate of coverage of needs.
- Performance of the surface network and of any heat pumps.
- Project economics and capacity to operate over time.
Points to watch
- Geological and flow rate risk must be addressed before the investment decision.
- Mining and environmental permits may weigh on the timetable.
- The project must be sized on a lasting and sufficiently concentrated thermal demand.
- Drilling costs and contingencies must be included in the financing plan.
The CHOICE view
Deep geothermal energy is an infrastructure project, not simply a piece of energy equipment. CHOICE must link certainty about the resource, consumer commitment and the financing of drilling risk. The application is solid when the heat is already saleable before the first well is even drilled.
How to prepare your project
- Finalise the geological and hydrogeological studies.
- Secure heat demand and, where applicable, contracts with network subscribers.
- Establish the drilling scenario, contingency budget and regulatory timetable.
- Build the economic model of the MWh delivered over time.
- Contact ADEME early to validate the aid calculation method.
Official sources
The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.
How CHOICE works on this kind of application
Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.
- Our approach Improve and de-risk the project before financing it.
- Our services Assessment, business plan, preparing and filing the application, representation, follow-up.
- Our references More than 130 projects supported over ten years, and the firm's accreditations.
- The evidence map of a fundable project Also worth reading in our publications.
- All funding schemes The full catalogue, with conditions and deadlines.