ADEME: Biomass / wood heat production installations
Replace fossil heat with renewable production from biomass.
At a glance
- Programme
- Fonds Chaleur
- Territory
- All regions
- Beneficiaries
- Companies, local authorities and associations
- Type of aid
- Investment grant
- Amount / rate
- Up to 45% to 65% depending on the project holder's status; no single national cap displayed
- Availability
- Rolling until 31 December 2026, subject to available funds
Information up to date as of 24 August 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.
The Fonds Chaleur (the French Heat Fund) funds biomass installations when they replace fossil energy with renewable heat in a technically relevant setting. ADEME (the French Agency for Ecological Transition) expects prior consideration of energy sufficiency, waste heat recovery and the other renewable resources available.
Which projects are funded?
The scheme targets biomass boiler plants producing at least 1,200 MWh/year of biomass heat at boiler outlet. For industry, the window in principle covers projects from 1,200 to 12,000 MWh/year; beyond that, large installations fall under the BCIAT call for projects (biomass heat for industry, agriculture and the tertiary sector). Smaller projects may be handled through a Contrat Chaleur Renouvelable (renewable heat contract).
Who can apply?
- Industrial, tertiary or agricultural companies with significant thermal needs.
- Local authorities and associations carrying a biomass heat installation.
- The project must have a biomass supply that meets the required sustainability and quality criteria.
Which costs are eligible?
- Biomass boiler and heat production equipment.
- Necessary storage, feeding, flue gas treatment and auxiliary systems.
- Associated distribution equipment where directly linked to the supported project.
- Implementation works included in the Fonds Chaleur cost base.
How much funding is available?
ADEME indicates aid of up to 45% to 65% depending on the project holder's status and the applicable regime. The final amount depends on heat output, eligible costs and the economic analysis of the project.
There is no single national cap displayed on the scheme page; projects of sufficient size can therefore well exceed €90k of aid.
Main selection criteria
- Prior reduction of energy needs and relevance of biomass under the EnRChoix approach (ADEME's method for choosing between renewable options).
- Annual heat output and sizing relative to the actual consumption profile.
- Quality and sustainability of the biomass supply.
- Energy and environmental performance of the installation, particularly air quality.
- Project economics and competitiveness of the heat cost over time.
Points to watch
- Biomass must be justified against heat recovery, geothermal energy and solar thermal.
- Supply risk is central: price, volumes, distance and certification must be documented.
- The output threshold of 1,200 MWh/year distinguishes this window from Contrats Chaleur Renouvelable.
- Above 12,000 MWh/year for industry, the project in principle falls under BCIAT.
The CHOICE view
The question is not only whether a biomass boiler is eligible, but whether it is the best solution over fifteen to twenty years. CHOICE must connect consumption profile, fuel security, full cost of heat and carbon trajectory. A well-funded project that depends on a fragile supply remains a bad investment.
How to prepare your project
- Establish the hourly and annual profile of heat needs.
- Compare biomass, waste heat, geothermal energy and solar thermal under an EnRChoix approach.
- Secure the biomass supply plan and its certifications.
- Size the installation and calculate the full cost of the heat produced.
- Prepare the feasibility study, quotes and financing plan before committing.
Official sources
The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.
How CHOICE works on this kind of application
Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.
- Our approach Improve and de-risk the project before financing it.
- Our services Assessment, business plan, preparing and filing the application, representation, follow-up.
- Our references More than 130 projects supported over ten years, and the firm's accreditations.
- A strong application starts before the call for projects Also worth reading in our publications.
- All funding schemes The full catalogue, with conditions and deadlines.