← All publications

Funding schemes

ADEME: Combined solar system installations

Produce space heating and domestic hot water with solar thermal energy.

Status
Open
Next deadline
31 December 2026
Operator
ADEME

At a glance

Programme
Fonds Chaleur
Territory
All regions
Beneficiaries
Companies, local authorities, public institutions and associations
Type of aid
Investment grant
Amount / rate
Flat-rate aid based on the quantity of heat produced; no single national cap displayed
Availability
Rolling until 31 December 2026

Information up to date as of 24 August 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

Combined solar systems use solar thermal collectors to cover part of both space heating and domestic hot water needs at the same time. The Fonds Chaleur (the French Heat Fund) supports these installations in new or renovated buildings when the uses exist all year round and the sizing is justified.

Which projects are funded?

The scheme targets collective heat production installations combining space heating and domestic hot water from solar thermal collectors. They can be fitted to different types of buildings, both new and under renovation, provided that uses are sufficiently regular.

Who can apply?

  • Companies that own or operate tertiary, industrial or agricultural buildings.
  • Local authorities, public institutions and associations.
  • The project must have undergone a feasibility study demonstrating solar productivity and the relevance of the system.

Which costs are eligible?

  • Solar thermal collectors and their integration.
  • Thermal storage, exchangers, controls and hydraulic equipment.
  • Adaptation of internal heating and hot water networks linked to the installation.
  • Instrumentation and performance monitoring required by the scheme.

How much funding is available?

The aid is calculated on the basis of a flat-rate amount depending on the quantity of renewable heat produced by the installation.

The amount is therefore not capped uniformly at national level; it depends on the output accepted and on the project assessed.

Main selection criteria

  • Quality of the feasibility study and consistency of sizing.
  • Annual output of genuinely useful solar heat.
  • Energy performance of the building and prior reduction of needs.
  • Quality of storage and controls to limit losses.
  • Performance monitoring after commissioning.

Points to watch

  • The combined system is only relevant if the building has a demand profile compatible with the solar resource.
  • Prior reduction of consumption must be addressed before oversizing production.
  • Storage is a key element of annual efficiency.
  • Regional approval by ADEME (the French Agency for Ecological Transition) must precede any commitment of expenditure.

The CHOICE view

A combined solar system must be designed as a complete building-storage-production system. CHOICE must check that energy renovation, network temperatures and usage profile are compatible with solar. Without this consistency, the aid may fund equipment that will remain underused.

How to prepare your project

  • Analyse space heating and hot water needs over a year.
  • Commission the solar and thermal feasibility study.
  • Check the compatibility of emitters and network temperatures.
  • Optimise storage and the back-up strategy.
  • Build the investment budget and timetable before submitting.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.