ADEME: Building anaerobic digestion installations

Fund an anaerobic digestion unit producing and using biogas or biomethane.

Status
Open
Next deadline
31 December 2026
Operator
ADEME

At a glance

Programme
Fonds Chaleur / Circular economy
Territory
20 regions and territories
Beneficiaries
Companies, including agricultural and agri-food companies, local authorities and associations
Type of aid
Investment grant
Amount / rate
Injection: €45/MWh HHV, aid capped at €700k; specific terms for atypical projects or wastewater treatment plants
Availability
Rolling until 31 December 2026, depending on territories and available funds

Information up to date as of 24 August 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

ADEME (the French Agency for Ecological Transition) supports anaerobic digestion investments once a feasibility study has confirmed the technical, economic and environmental relevance of the project. The scheme targets in particular units producing biomethane injected into the grid and certain uses of biogas.

Which projects are funded?

Eligible projects include in particular anaerobic digestion units producing biogas with energy recovery, especially through upgrading and injection of biomethane into the public grid. Urban wastewater treatment plants may also be concerned for biogas recovery through injection.

Who can apply?

  • Agricultural, agri-food and other companies directly carrying the installation.
  • Local authorities and associations eligible under territorial rules.
  • The scheme is not open to individuals benefiting from the tax credit.

Which costs are eligible?

  • Biogas production equipment: reception, preparation, digestion, storage and treatment of feedstock.
  • Biogas upgrading and biomethane injection equipment.
  • Energy recovery equipment and auxiliaries directly necessary for the operation of the unit.
  • Works and equipment included in the cost base after regional assessment.

How much funding is available?

For injection projects, the aid is mainly calculated on a flat rate of €45 per MWh HHV of annual production capacity, with a cap of €700k.

Atypical and innovative projects and certain wastewater treatment plants may fall under other calculation methods. Regional conditions must therefore be checked before finalising the financing plan.

Main selection criteria

  • Quality of the feasibility study and robustness of the unit's sizing.
  • Security of feedstock, its traceability and its availability over time.
  • Energy and environmental performance of biogas use.
  • Control of digestate outlets and of the spreading or recovery plan.
  • Soundness of the business model after accounting for energy revenues and operating costs.

Points to watch

  • Support conditions vary by territory: check whether the relevant regional office is open and what its rules are.
  • Sizing must be consistent with the feedstock actually secured; oversizing is a major risk.
  • ICPE permits (classified installations for environmental protection), grid connection and injection constraints must be anticipated.
  • Digestate is a flow to be managed economically and in regulatory terms, not a mere by-product.

The CHOICE view

An anaerobic digestion application depends less on the digester than on the complete feedstock-production-injection-digestate chain. CHOICE must test the robustness of supply contracts, the expected yield, maintenance costs and the sensitivity of the model to the volumes actually injected. The aid reduces CAPEX but does not make up for a poorly sized unit.

How to prepare your project

  • Finalise the feasibility study and the mass and energy balance.
  • Secure contracts or commitments on feedstock and grid connection.
  • Precisely cost CAPEX, OPEX, energy revenues and digestate management costs.
  • Prepare the administrative permits and the commissioning timetable.
  • Contact the ADEME regional office before submitting to confirm the applicable terms.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.