← All publications

Funding schemes

ANR / Clean Energy Transition Partnership: Joint Call 2026

Build a transnational R&I project to accelerate the energy transition.

Status
Open
Next deadline
11 March 2027 (transnational procedure)
Operator
ANR / CETPartnership

At a glance

Programme
Horizon Europe: CETPartnership Joint Call 2026
Territory
Transnational
Beneficiaries
International consortia including eligible French teams
Type of aid
Coordinated national grants
Amount / rate
Amount based on the ANR 2026 national annex and the partner's status; potential > €90k
Availability
Call open since 24 July 2026; intermediate stages as set out in the call text

Information up to date as of 24 August 2026, valid until 11 March 2027. Scheme conditions change: check with the funding body or ask us for confirmation.

The fifth call of the Clean Energy Transition Partnership brings together more than 60 funding agencies from 35 countries to support transnational research and innovation projects on the energy transition. ANR (the French National Research Agency) and the Pays de la Loire Region contribute to funding French partners in the relevant modules.

Which projects are funded?

Transnational R&I projects covering in particular the resilience and flexibility of energy systems, renewables, industrial carbon management, hydrogen and renewable fuels, stationary storage, heating and cooling, and energy integration in the built environment. The modules actually funded by ANR must be checked in the 2026 national annex.

Who can apply?

  • Consortia of at least three independent entities from several participating countries, under the transnational rules.
  • Laboratories, companies and other eligible players in their country.
  • For the French part, each partner must comply with the eligibility and funding rules of ANR or of the relevant regional funder.

Which costs are eligible?

  • Eligible R&D staff under the national funder's rules.
  • Equipment and depreciation needed for the work.
  • Services, subcontracting, consumables, travel and coordination.
  • Demonstration or experimentation where the chosen module allows it.

How much funding is available?

Each national funder funds its own beneficiaries. The French partner's aid is therefore determined by the ANR 2026 national annex and not by a single European rate.

Transnational projects can mobilise large budgets and a French partner's aid may exceed €90k. The exact cap and the applicable rates must be checked in the national rules in force before submitting.

Main selection criteria

  • Scientific and technological excellence of the project.
  • Impact on the energy transition and deployment potential.
  • Transnational added value and complementarity of the consortium.
  • Fit with the chosen call module and with national priorities.
  • Credibility of the work plan, governance and exploitation.

Points to watch

  • A single consortium must comply with both the transnational rules and those of each national funder.
  • Check very early that the chosen module is indeed funded by ANR for French partners.
  • The involvement of several countries increases the time needed to secure budgets, roles and administrative documents.
  • The intermediate stage dates in the call text take precedence over the final date displayed on the ANR portal.

The CHOICE view

CETPartnership is relevant for a project that genuinely needs foreign partners and a European demonstration ground. Adding countries merely to fit the format weakens the application; the cooperation must solve a problem that a national consortium could not address as effectively.

How to prepare your project

  • Choose the call module and check French eligibility in the ANR annex.
  • Build a complementary consortium before detailing the work packages.
  • Align national budgets with each partner's scientific role.
  • Define energy, industrial and climate impact indicators.
  • Prepare the transnational documents and any additional national submissions at the same time.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.