ADEME: Structuring studies and investments for waste management in overseas France and Corsica
Fund studies, then equipment for sorting, recovering and treating waste in overseas France and Corsica, led by a local authority or a private operator.
At a glance
- Programme
- ADEME financial aid, 2026 catalogue; 2026 eligibility and funding conditions
- Territory
- Overseas France: French overseas departments and regions (Guadeloupe, French Guiana, Réunion, Martinique, Mayotte), overseas collectivities and New Caledonia; and Corsica
- Beneficiaries
- Preferred targets: local authorities responsible for waste management and private operators acting on behalf of waste producers; priority to private project owners for trade recycling centres
- Type of aid
- Grant, set by a funding contract and paid according to the progress of the operation
- Amount / rate
- Indicative maximum rates: studies 60% to 80% depending on size, on no more than €50,000 (diagnosis) or €100,000 (feasibility) of costs; investment 10% to 75%, including sorting centre or trade recycling centre overseas at 75, 65 or 55% depending on size, aid capped at €1.7 million or €0.75 million
- Availability
- Aid valid until 31 December 2026, with no published application deadline; application on ADEME's AGIR platform, before any start and any order
Information up to date as of 10 November 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.
In overseas France and Corsica, ADEME (the French Agency for Ecological Transition) supports studies, then structuring investments that facilitate the sorting, recovery and final treatment of waste, with a view to structural catch-up. Its preferred targets are local authorities responsible for waste management and private operators acting on behalf of waste producers: a company creating a sorting centre or a trade recycling centre can thus receive aid of up to 75% overseas, within a limit of €1.7 million or €0.75 million of aid. The published rates are indicative maximums, and the aid is valid until 31 December 2026, with no published application deadline.
Which projects are funded?
Structuring studies and investments that facilitate the sorting and recovery of waste, as well as its final treatment, such as:
- creating or renovating local authority recycling centres, sorting centres and transfer stations;
- creating or renovating sorting centres and trade recycling centres;
- creating composting platforms;
- creating solid recovered fuel (CSR) preparation centres;
- creating energy recovery facilities;
- creating or extending waste landfill sites;
- clearing illegal dumpsites.
ADEME aims to create collection, recovery and treatment facilities in areas that lack them, to develop a territorial network and to improve waste management performance, in order to recover more household and commercial waste and reduce residual waste.
Sorting centres and trade recycling centres. Support goes primarily to private project owners creating a recycling centre for businesses' commercial and industrial waste (DAE), in order to relieve the facilities dedicated to households, create facilities where economic activity exists and increase the DAE recovery rate. ADEME can in particular support:
- trade recycling centres under private project ownership (under public project ownership only where no private project holder comes forward), which collect DAE in partnership with local stakeholders;
- DAE sorting centres, including a secondary sorting line for DAE sorting rejects for material recovery;
- bulky waste sorting centres;
- inert waste sorting and recovery centres;
- CSR preparation centres.
A trade recycling centre can include a sorting centre function, some sites having a dual function for reasons of economic efficiency or land availability.
Composting platforms. Only projects led by a local authority or with a pooled dimension, which provide a solution to several biowaste producers, are eligible; a strictly individual project, which benefits only its holder, is not. Eligible projects cover the creation of platforms treating green waste (alone or with biowaste), separately collected biowaste (platforms holding a health approval for category 3 animal by-products) or, where applicable, sargassum; the adaptation of an existing facility to new streams; and small equipment for local biowaste management (shared composting, on-site composting in establishments, individual composters or shredders).
Local authority recycling centres, sorting centres and transfer stations. The aid enables local authorities to complete their network of transfer stations, recycling centres and multi-stream drop-off points (écopoints), to renovate their ageing recycling centres provided they reach a performance level defined for each territory (reuse area, access control for professionals, for example), to create sorting centres for household packaging and graphic paper compatible with the extended sorting instructions, and to test facilities adapted to the local context. Like-for-like replacement of a recycling centre is not eligible.
Studies. Diagnoses, studies and experiments responding to the territorial context, studies prior to investment, studies to optimise the public waste management service (including waste characterisation). They may cover the identification of waste producers, forecast waste volumes, existing and planned treatment facilities and, for extended producer responsibility (EPR) schemes, streams by material and the support of the relevant producer responsibility organisation.
Waste landfill and illegal dumpsites. This component is aimed at local authorities and their delegatees: creation or extension of landfill cells or sites, conditional on prevention commitments, including a reduction in residual household waste per inhabitant over 3 to 5 years; rehabilitation of landfill sites; clearance of illegal dumpsites, with prioritisation imposed by limited budgets; simplified landfill sites in isolated locations, or for sargassum and waste from natural disasters.
Energy recovery. Incineration units with energy recovery (according to the R1 energy efficiency criterion) and CSR recovery plants are examined case by case, in particular as regards the legal basis of the aid. Anaerobic digestion is not part of this scheme: it may fall under other national schemes.
Who can apply?
- Territories: the French overseas departments and regions (Guadeloupe, French Guiana, Réunion, Martinique, Mayotte), the overseas collectivities, New Caledonia and Corsica. The Transition écologique des entreprises public portal also cites French Polynesia, Saint-Barthélemy, Saint-Martin, Saint Pierre and Miquelon, the French Southern and Antarctic Lands and Wallis and Futuna.
- Preferred targets: local authorities responsible for waste management, and private operators acting on behalf of waste producers.
- Companies, depending on the component:
- sorting centres and trade recycling centres: priority to private project owners;
- composting: only for a pooled project, serving several biowaste producers;
- local authority recycling centres and transfer stations: a company, an association or a social and solidarity economy organisation can be a beneficiary by providing an agreement drawn up with the local authority (public service delegation or an arrangement backed by the public service);
- waste landfill: component reserved for local authorities and their delegatees.
- Size: small, medium-sized or large company within the meaning of the European definition; the maximum rate depends on it.
- Exclusions: recycling centres internal to an industrial site, and strictly individual composting projects.
Which costs are eligible?
- Sorting centres: the process and its ancillary equipment needed for the upstream-downstream operation of the sorting line (supervision included), its feed system (excluding mobile machinery) and the downstream equipment for conditioning materials for recovery, balers in particular.
- Trade recycling centres: the installations and equipment needed to operate the recycling centre; mobile equipment (compactor, shredder, loader for bay-based recycling centres) if its presence on site is necessary for optimised operation.
- Excluded for sorting centres and trade recycling centres: land acquisition, demolition works, soil remediation studies and works, equipment arising from a regulatory obligation (sprinkler system, water retention basin...) and anything that does not meet ADEME's priorities. Eligibility and the aid amount are calculated on the basis of the bids selected by the project holder.
- Composting platforms: civil engineering (earthworks, roads and utilities, offices, sanitary facilities), connection to the electricity grid (5 km at most), reception or unloading buildings and windrow covering, composting process, substrate preparation (shredding, ferrous metal removal, screens, trommels), forced aeration, treatment of exhaust air. Excluded are land purchase, upgrades to meet regulatory standards, electric composters and depackaging equipment for packaged biowaste.
- Local authority recycling centres (non-exhaustive list): safety works, roads and utilities, reception building and technical premises, necessary mobile equipment, fixed equipment (weighbridge, access control, skips), management or user identification software, additional unloading bays, works that encourage sorting.
- Landfill (non-exhaustive list): earthworks, roads and utilities, rainwater and leachate management, biogas collection, cell bottom lining, loading and compaction equipment, final capping, site restoration after illegal dumping, pre-sorting platform, measurement of environmental parameters.
- Studies: excluded are strictly regulatory studies, those ordered or started before the application is submitted on AGIR, ADEME's online application platform, and those whose subject does not match ADEME's priorities.
- Common rules: land acquisition is never eligible. For landfill, recycling centre, sorting centre and composting investments, in-house design and works supervision, training and communication are each limited to 10% of the operation's eligible costs.
How much funding is available?
The published rates are indicative maximums: the rate is only final after appraisal, at the assessor's discretion, having regard in particular to the incentive effect of the aid, the context and relevance of the project, its ambition and overall performance, and the precision of the information provided.
- Sorting centres, consolidation centres and trade recycling centres: overseas, 75% for a small company, 65% for a medium-sized company, 55% for a large company and 75% for non-economic activity (in Corsica: 65, 55, 45 and 65%). The aid is capped at €0.75 million for a trade recycling centre and at €1.7 million for a sorting centre. It is calculated according to the territory, after analysis of the economic incentive effect, in compliance with the cumulation of public aid authorised by the European State aid framework and national regulations.
- Composting: same maximum rates (overseas: 75, 65, 55 and 75%; Corsica: 65, 55, 45 and 65%), with no published cap.
- Local authority recycling centres and transfer stations: overseas, 75% (small company), 65% (medium-sized), 55% (large) and 75% for non-economic activity; in Corsica, 65, 55, 45 and 65%. Sorting centres for household packaging and graphic paper are supported at 10%, within a limit of €1.2 million of aid.
- Studies: 80% for a small company or for non-economic activity, 70% for a medium-sized company, 60% for a large company. Eligible costs are capped at €50,000 for a diagnosis and at €100,000 for a feasibility study: the cap applies to the cost base, not to the aid, i.e. no more than €80,000 of aid for a feasibility study supported at 80%.
- Landfill and illegal dumpsites: creation or extension of landfill cells or sites, 20% of an eligible cost capped at €40 million excl. VAT; rehabilitation of landfill sites, 50%, cap set case by case; clearance of illegal dumpsites, 50% of an eligible cost capped at €1.5 million excl. VAT; simplified landfill in isolated locations, for sargassum or for climate events, 50% of an eligible cost capped at €2 million excl. VAT. For a project relating to an economic activity, the aid is based on Article 45 of the General Block Exemption Regulation (GBER), after a dedicated techno-economic analysis.
- Energy recovery: case-by-case analysis, with no published rate.
- Payment: in one or more instalments according to progress, as provided for in the funding contract, on presentation of technical and financial documents, in particular the overall summary statement of expenditure (ERGD). For sorting centres and recycling centres, the balance may be conditional on meeting an overall sorting performance target for the site for material recycling. If the contract is not complied with, ADEME may request repayment of the aid.
Main selection criteria
Conditions common to all components:
- the project has neither started (if carried out in-house) nor been ordered (if it uses a service provider) before the application is submitted on the AGIR platform;
- studies and investments resulting solely from regulatory obligations are not eligible, nor is the like-for-like renewal or reconstruction of existing facilities;
- the project shows proven territorial value: structuring effect, consistency with existing facilities, optimisation of the territorial network, consideration of possible pooling;
- it is compatible with territorial plans: regional waste prevention and management plan (PRPGD), local plans for the prevention of household and similar waste (PLPDMA), or even the multiannual energy programme (PPE); it is suited to the territory's context (technical relevance, choice of process, match between resources and objectives);
- for a project linked to products subject to an EPR scheme, the project holder approaches the producer responsibility organisations concerned in advance (technical, logistical or financial support, guaranteed waste supply, by contract where applicable) and provides the results of this approach;
- before an investment, ADEME may require a feasibility study that argues the relevance of the solution, its market potential and its expected impacts and benefits, and sizes the investment; its terms of reference are discussed with the ADEME engineer.
For a sorting centre or a trade recycling centre, the appraisal examines:
- the relevance of the project in the territory: state of competition and potential streams, consistency with existing facilities;
- the reduction in tonnages landfilled;
- incoming streams: nature, origin, characteristics, share sorted at source;
- the means (information and equipment) deployed at customers' premises for sorting at source;
- the choice of process, its characteristics and performance, including sorting and recycling performance for a sorting centre;
- the recovery rate per output stream, forecast tonnages and the fate of outgoing streams;
- the current and target reject rate;
- investment and operating costs;
- impacts on the environment, employment and working conditions;
- the works schedule.
For a composting platform: compliance with regulations where biowaste is recovered downstream by a third party (spreading plans, for example), actions to reduce food waste among producers of organic waste, a supply plan that justifies the need, and particular attention to nuisances (odours, noise, supply, water management).
Points to watch
- The rates are indicative maximums. ADEME aid is neither an entitlement nor automatic, and the agency may reduce its aid if the operation is co-funded.
- The aid does not relieve companies that produce waste of any cost or treatment obligation incumbent on them under European or national law, including under EPR schemes, nor of the normal costs of a business.
- The caps are not of the same nature depending on the component: for studies and landfill, they apply to eligible costs; for sorting centres and trade recycling centres and for household packaging sorting centres, to the aid amount.
- The public portal summarises the amount as "up to 80% depending on the project, within a limit of €100,000": these are the maximum rate and the cost cap for feasibility studies, not an aid limit applicable to investment.
- The ADEME document gives no application deadline: 31 December 2026 is the end of the aid's validity according to the public portal and Aides-territoires. ADEME advises contacting its regional directorate before applying.
- For local authority recycling centres, where equipment can be supported by an EPR scheme, any ADEME funding is examined in light of the specifications and obligations of the producer responsibility organisations.
- Payment of the balance of aid to a sorting centre or a recycling centre may be conditional on meeting an overall sorting performance target for the site for material recycling: the sorting performance announced in the application should be estimated with caution.
- The catalogue's "Sorting centres for commercial and industrial waste" fact sheet describes ADEME's aid for the same equipment in regions of mainland France, on the terms of each regional directorate; this one is specific to overseas France and Corsica, publishes its rates and caps, and also covers studies, composting, local authority recycling centres, energy recovery, landfill and illegal dumpsites.
The CHOICE view
For an overseas waste or recovery company, the most directly useful component is sorting centres and trade recycling centres under private project ownership: the maximum rates are high, but the aid caps (€1.7 million for a sorting centre, €0.75 million for a trade recycling centre) limit the share funded for a large facility. The application hinges on proof of territorial need: competition and existing facilities, documented DAE volumes, outlets for outgoing streams, target reject rate, operating costs. A feasibility study, itself eligible for aid and which ADEME may require, secures this sizing. For CHOICE, it is also necessary to keep to the timetable, since nothing can be ordered before submission on AGIR, to anticipate the sorting performance target that may condition the balance and, for a composting project or a facility operated for a local authority, to ensure genuine pooling or a properly drawn-up agreement. The rate granted is only known at appraisal, and ADEME's approval is never guaranteed.
How to prepare your project
- Contact the ADEME regional directorate before submission, as it advises, to place the project in the right component and have the content of the study or the terms of reference validated.
- Do not start or order anything before submitting the application on AGIR.
- If needed, start with a diagnosis or a feasibility study, based on terms of reference discussed with ADEME; for a sorting centre or a recycling centre, it sizes the facility and assesses competition and existing facilities within the catchment area.
- Document the project's territorial value and its compatibility with the PRPGD and local plans.
- For a stream covered by an EPR scheme, approach the producer responsibility organisations in advance and attach the results of this approach.
- Cost the project on the basis of the bids selected, isolate non-eligible costs (land, demolition, remediation, equipment required by regulations) and keep in-house design and works supervision, training and communication below 10% each.
- Create an account and submit the application on AGIR from the scheme page on the ADEME website: administrative data (SIRET number, SME status), context, description, objectives and environmental gains, total cost and breakdown of costs (rental or leasing to be reported), preliminary studies for an investment, tender specifications for a study.
- After approval, comply with the commitments of the funding contract: invite ADEME to monitoring committees, communicate according to its general rules, submit the progress reports and the final report.
Official sources
- ADEME: 2026 eligibility and funding conditions
- ADEME: scheme page
- Transition écologique des entreprises: scheme page
- Aides-territoires: aid fact sheet, updated on 2 November 2026
The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.
How CHOICE works on this kind of application
Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.
- Our approach Improve and de-risk the project before financing it.
- Our services Assessment, business plan, preparing and filing the application, representation, follow-up.
- Our references More than 130 projects supported over ten years, and the firm's accreditations.
- From network to proof Also worth reading in our publications.
- All funding in overseas France The full catalogue, with conditions and deadlines.