Centre-Val de Loire Region: Renewable Energy €1 Citizen = €1 Region

Fund the emergence, studies and investment of cooperative and citizen renewable energy projects rooted in the local area.

Status
Open
Next deadline
Rolling
Operator
Centre-Val de Loire Region

At a glance

Programme
Support for holders of cooperative and citizen renewable energy production projects (intervention framework of 7 June 2024)
Territory
Centre-Val de Loire
Beneficiaries
Local authorities (municipality, EPCI, PETR...), associations, local cooperative and citizen renewable energy companies, energy communities; private individuals excluded
Type of aid
Grants: flat-rate mobilisation aid, aid for studies and development, investment bonus
Amount / rate
Mobilisation: €2,000; studies: 70%, €10,000 per study (AMO: €20,000); investment: €1 per citizen euro, at most €100,000 and 50% of the cost excluding VAT
Availability
Rolling submission on the Region's online aid portal; scheme in force since 7 June 2024

Since 2019, the Centre-Val de Loire Region has supported renewable energy production projects that involve citizens, local authorities and local stakeholders in their governance. Its intervention framework, amended on 7 June 2024, provides for three independent forms of aid: a flat-rate mobilisation grant, aid for studies and development, and an investment bonus that pays €1 for every euro a citizen contributes to the project's capital. Applications are submitted on a rolling basis on the Region's online aid portal.

Which projects are funded?

Participatory and citizen renewable energy production projects located in Centre-Val de Loire, at every stage:

  • Emergence: organising the mobilisation of citizens around the project and public consultation, for example through communication activities, meetings, workshops, questionnaires or field surveys, or setting up the collection of citizen funds.
  • Development: legal and economic studies (articles of association, governance, viability), pre-feasibility and techno-economic feasibility studies, project management assistance (AMO).
  • Investment: construction of one or more production installations.

The eligible sectors are:

  • renewable electricity: photovoltaics, wind, hydroelectricity (only projects without a dam or with a run-of-river turbine could be eligible, to guarantee ecological continuity);
  • renewable heat: geothermal, biomass, solar;
  • anaerobic digestion;
  • including, according to the intervention framework, energy storage and recovery facilities.

Who can apply?

  • Local authorities: municipalities, EPCIs (public intermunicipal cooperation bodies), PETRs (rural and territorial cooperation hubs), the source leaving the list open ("municipality, EPCI, PETR...").
  • Associations.
  • Local cooperative and citizen renewable energy production companies, in the form of an SCIC (cooperative society of collective interest), SAS, SA (both joint-stock companies) or SEM (semi-public company), in which local stakeholders (local authorities, entrepreneurs, citizens, farmers...) hold at least 40% of the capital and have a blocking minority on all of the project's structural decisions.
  • Renewable energy communities and citizen energy communities within the meaning of the French Energy Code (articles L291-1 to L294-1).

Private individuals are not eligible. A local authority can therefore apply for the aid in its own name, or take a stake in a local company, where it counts among the local stakeholders who must together hold at least 40% of the capital. The investment bonus requires at least 20 citizens to hold shares in the project: the source does not specify how it applies to a project led directly by a local authority, without a project company, which is to be confirmed with the assessing department.

Which costs are eligible?

  • Mobilisation: facilitation and consultation costs, such as room hire, communication costs, catering, workshops or surveys.
  • Studies and development: legal, economic and technical studies, AMO services. Regulatory or mandatory studies, in particular impact assessments, are not eligible.
  • Investment: only the initial investment in production installations is eligible; operating phases and the reinvestment of profits are excluded.

How much funding is available?

  • Mobilisation aid: flat rate of €2,000, with 80% paid on notification and 20% as the balance on presentation of supporting documents.
  • Study aid: up to 70% of the cost of the study (excluding or including VAT), capped at €10,000 per study.
  • AMO aid: up to 70% of the cost of the service including VAT, capped at €20,000, reserved for large-scale projects (photovoltaics over 200 kWp, wind over 1 MW).
  • Investment bonus: for a project with at least 20 citizens in its capital, the Region pays an amount equal to the sum invested by each citizen, up to €1,000 per contribution. Total aid is capped at €100,000 and at 50% of the project's investment cost excluding VAT.

The intervention framework adds that, as a result, citizen participation must not exceed 50% of the project's estimated cost, capped at €100,000: the exact scope of this sentence should be clarified with the assessing department. For studies and investment, a 50% down payment is made on proof of start (declaration of commencement of works for investment), with the balance paid on supporting documents. The bonus paid is calculated in proportion to the final citizen participation when the works are completed.

The aid falls under the European de minimis regulation (Regulation (EU) 2023/2831): the total de minimis aid received by a single project holder may not exceed €300,000 over three rolling years.

Main selection criteria

For mobilisation aid, the organisation demonstrates that it carries out awareness-raising and mobilisation activities, that its members share objectives consistent with the territorial project led by the local authority, and that initial thinking on the legal and financial set-up is under way.

For study aid, the project holder proves that it has begun the regulatory procedures (impact assessments, public inquiries, planning permissions, etc.) and that the studies will enable the project to meet the four dimensions expected by the Region.

For the investment bonus, the project demonstrates that it does not benefit from a national support tariff, then that it meets four criteria:

  • Environmental: biodiversity, soil protection, natural heritage, landscapes, residents' living environment, landscape integration.
  • Cooperative and citizen: shared objectives, governance, strategy for mobilising as many people as possible, diversity of local partners (in the capital, by making rooftops available, etc.).
  • Social and territorial: consistency with the territorial project, mobilisation of local skills, consultation and communication, sufficient number of citizens in the capital.
  • Techno-economic and financial: technology, legal form of the project company, site, business model, guarantees of success.

Points to watch

  • A project that benefits from a regulated feed-in tariff cannot receive the investment bonus: the intervention framework cites as eligible installations under an over-the-counter power purchase agreement (PPA) and individual or collective self-consumption projects.
  • Each form of aid can be used only once: mobilisation aid once per beneficiary, study aid once per project and per type of study, the bonus once per project.
  • The amount voted by the Regional Standing Committee cannot be revised, even if the justified expenditure exceeds the forecast.
  • The final bonus follows the final citizen participation: an incomplete or overstated subscription table reduces the aid paid.
  • The documents reviewed do not say whether expenditure may be committed before submission or before the decision; the framework refers to the Region's general aid regulations: to be confirmed before placing any order.
  • For a biomass boiler plant or a geothermal operation, ADEME's Fonds Chaleur (the French Heat Fund), already in the catalogue, funds the installation under its own rules, whereas the regional bonus rewards citizens' contributions to the capital: whether the two can be combined is checked in the financing plan.

The CHOICE view

This scheme suits municipalities and intermunicipal bodies that want to anchor a photovoltaic, wind, anaerobic digestion or renewable heat project in governance shared with residents, particularly for self-consumption or over-the-counter sales. Mobilisation and study aid are accessible early on; the investment bonus, on the other hand, requires capital open to at least 20 citizens, and therefore in practice a project company, which remains to be confirmed for a project led directly. The following must be secured: the legal set-up and the local authority's place in the capital, the mobilisation of at least 20 citizens (bearing in mind that the €100,000 cap can only be reached with at least a hundred contributions supported at €1,000), and a business model without a feed-in tariff. On the local authority side, the council resolution, the financing plan, cumulation with other aid and the de minimis ceiling must be ready before submission, and the lead time of around three months until notification must fit into the budget calendar, without starting works before checking the start-of-works rule.

How to prepare your project

  • Choose the form or forms of aid suited to the project's stage: they are independent, and mobilisation aid is not a prerequisite for the other two.
  • Have the competent body adopt a resolution approving the project, and the associated financing plan if there is one.
  • Prepare the common core documents: a letter to the President of the Region specifying the aid requested, letters of support, documents attesting to local momentum and to the project's progress.
  • Draft the presentation file using the Region's template specific to each form of aid, entering "none" in sections that do not apply, and attach the quotes.
  • For investment, add the detailed financing plan with the public aid received or planned, the co-funders' commitments, the table of citizen subscriptions and its sworn statement, the quotes (including civil engineering and grid connections), proof of land control and the business model.
  • Submit the application on the Region's online aid portal: after an acknowledgement of receipt by email and a technical assessment, the Regional Standing Committee decides, and notification follows around three months after the acknowledgement of receipt.
  • For any question about submission: environnement@centrevaldeloire.fr or 02 38 70 31 24.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.