Publications

Public authorities

Funding from the State, the Regions, agencies and European funds for municipalities, intermunicipal bodies, departments and public institutions: what it funds, on what conditions, to what timetable, and how to prepare the application. Each fact sheet shows the date it was last updated and, where relevant, its deadline.

See also: funding schemes (74), funding for academic research (14), funding in overseas France (8)

Calls for projects

Sorted by submission deadline, the nearest first. The dates shown are those checked at the last update.

  1. in 43 days ADEME: functional and cooperative economy ADEME · 15 regions and overseas territories, including Brittany, Normandy, Occitanie and La Réunion; coverage of Centre-Val de Loire to be confirmed
  2. in 43 days Fonds vert: air quality in conurbations with major issues French State / Regional prefects · Mainland France, in the 25 conurbations of more than 150,000 inhabitants listed in Annex 1 of the guidance handbook
  3. in 43 days Fonds vert: engineering support for local authorities French State / Departmental prefects · France (national)
  4. in 43 days Fonds vert: sustainable mobility in rural and medium-density areas French State / Regional prefects · France (national), in rural or intermediate-density EPCIs
  5. in 43 days Fonds vert: land recycling and brownfield redevelopment French State (regional prefect); assessment by the DDT(M) or ADEME · France (national), including DROM and overseas collectivities
  6. in 43 days Fonds vert: renaturation of towns and villages French State (regional prefects) / water agencies · France (national)
  7. in 43 days Fonds vert: energy renovation of local public buildings French State (departmental prefectures) · France (national)

France (national)

Schemes without a single deadline: permanent window, rolling submission, or a timetable set locally.

  1. no single deadline French State: rural infrastructure grant (DETR) French State (departmental prefectures) · France (national)
  2. no single deadline French State: local investment support grant (DSIL) French State (regional prefectures) · France (national)

Loire-Bretagne basin

Schemes without a single deadline: permanent window, rolling submission, or a timetable set locally.

  1. no single deadline Agence de l'eau Loire-Bretagne: infiltrating urban stormwater into open ground Agence de l'eau Loire-Bretagne · Loire-Bretagne basin
  2. no single deadline Agence de l'eau Loire-Bretagne: wastewater treatment and reducing micropollutants at source Agence de l'eau Loire-Bretagne · Loire-Bretagne basin

Centre-Val de Loire

Schemes without a single deadline: permanent window, rolling submission, or a timetable set locally.

  1. permanent Centre-Val de Loire Region: Renewable Energy €1 Citizen = €1 Region Centre-Val de Loire Region · Centre-Val de Loire
  2. permanent Centre-Val de Loire Region: Regional Heritage Fund Centre-Val de Loire Region / Fondation du patrimoine · Centre-Val de Loire

A project to improve and finance?

Let's talk. A free first exchange to assess your project and the funding you can mobilise.