Fund investment projects by municipalities and intermunicipal bodies that meet one of the six priorities set by law.

Status
Open
Next deadline
Varies by department; Loir-et-Cher: 18 December 2026 at 23:59 (2027 funding round)
Operator
French State (regional prefectures)

At a glance

Programme
Local investment support grant (DSIL), Article L. 2334-42 of the CGCT
Territory
France (national)
Beneficiaries
All municipalities, all EPCIs with their own tax-raising powers and PETRs; project owners designated by a contract signed with the State
Type of aid
Investment grant
Amount / rate
Up to 80% according to the national fact sheet; amount set by the regional prefect, within a limit of 80% public aid
Availability
Filing on Démarche numérique, form shared with the DETR; Loir-et-Cher: 18 December 2026; other departments and regional prefecture: to be confirmed

The local investment support grant (DSIL) funds investment projects by municipalities and their groupings that meet one of the six priorities set by law. Its funds are allocated among the regions and awarded by the regional prefect, while assessment remains centralised at the departmental prefecture. Applications use the same national form as the DETR (rural infrastructure grant); in Loir-et-Cher, the 2027 call is open until 18 December 2026 at 23:59.

Which projects are funded?

The project must fall under one of the six priorities of Article L. 2334-42 of the CGCT (French General Local Authorities Code):

  • thermal renovation, energy transition, development of renewable energy;
  • bringing public facilities up to standard and making them safe;
  • development of infrastructure for mobility or for housing construction;
  • development of digital technology and mobile telephony;
  • creation, conversion and renovation of school buildings;
  • provision of accommodation and public facilities made necessary by an increase in the number of inhabitants.

The 2025 national review by the DGCL (directorate general for local authorities) notes a growing concentration of DSIL funding on the projects with the greatest structuring effect on their area, whose average cost continues to rise.

Who can apply?

  • All municipalities and all EPCIs (intermunicipal bodies) with their own tax-raising powers, in mainland France and the overseas regions, including Mayotte, with no population or wealth requirement.
  • Rural and territorial balance hubs (PETR).
  • By way of exception, where the grant forms part of a contract signed with the State's representative (Petites villes de demain, Action cœur de ville, CRTE ecological transition contract, for example), the project owners designated by the contract or by an amendment, such as intermunicipal syndicates or public bodies.

Departments and regions are not among the beneficiaries; departments fall under a separate grant, the DSID (departmental investment support grant), presented in the same national review. Intermunicipal syndicates are only among the beneficiaries when a contract signed with the State designates them.

Which costs are eligible?

The DSIL funds investment expenditure, for projects at the design stage as well as at the delivery stage. The project must fall within the remit of the local authority carrying it, and only one project owner may apply for the grant.

The 2027 guide of the Loir-et-Cher prefecture, common to the DETR and the DSIL, requires expenditure to be stated excluding VAT on the basis of priced estimates, and excludes in particular:

  • studies alone and the purchase of undeveloped land without works;
  • the purchase of vehicles;
  • minor road maintenance repairs and the creation of car parks outside an overall project with a mobility component;
  • oil- or gas-fired heating and hot water production;
  • photovoltaics other than for full self-consumption;
  • insurance, bailiff and reprographics costs, in-house labour and price revisions.

How much funding is available?

The DSIL is a grant whose rate can reach 80% according to the national fact sheet. Unlike for the DETR, the sources consulted do not publish a range of rates by category: the amount is set by the regional prefect. The local authority must retain a minimum contribution of 20% of public funding (Article L. 1111-10 of the CGCT), and exceeding the 80% public aid ceiling may lead the prefect to require full or partial repayment of the grant.

Funds are allocated among the regional prefectures, 65% according to the population of the regions and 35% according to the population of urban units with fewer than 50,000 inhabitants. As a benchmark, the 2025 national review reports 2,408 projects supported, an average grant amount around three times higher than for the DETR and an average rate of 11.7%.

Main selection criteria

  • Clear link between the project and one of the six statutory priorities.
  • Maturity of the application, in form and in substance, with quotes excluding VAT and a financing plan sought from all partners (Loir-et-Cher guide).
  • Projects forming part of a contract or a territorial project, structuring or jointly planned, benefiting several local authorities, with an assessment of the expected gains (Loir-et-Cher guide).
  • Contribution to environmental objectives: reduction of greenhouse gas emissions, energy renovation, economical use of land, electrification of uses and decarbonisation of energy (Loir-et-Cher guide).
  • Arbitration by the regional prefect between projects from across the region.

Points to watch

  • The DSIL, open to all municipalities, EPCIs with their own tax-raising powers and PETRs, is awarded by the regional prefect on six priorities set by law, whereas the DETR is reserved for eligible rural municipalities and EPCIs and awarded by the departmental prefect on the categories set by its committee of elected officials.
  • Unlike the Fonds vert (the French Green Fund), whose catalogue includes in particular the remediation of brownfield sites from former ICPE (classified installations for environmental protection) or mining sites, the DSIL is a general-purpose grant: in Loir-et-Cher, projects eligible for more specialised funding, including the Fonds vert, are normally redirected to it, and as a general rule the financing plan must not rely on combining State grants.
  • No start of execution (signed quote, purchase order, signed tender commitment) is allowed before filing, unless authorisation has been requested beforehand (Article R. 2334-24 of the CGCT); the national form even asks applicants not to start before the application has been declared or deemed complete: apply the stricter rule.
  • The envelope is tight: in Loiret, 20 operations were selected under the 2026 DSIL and the envelope was fully used by 31 July 2026.
  • The operation must start within two years of notification (one-year extension possible) and be completed within four years of its start (extension of two years at most).
  • The regional prefecture's own timetable could not be verified: its website was not accessible at the time of writing.

The CHOICE view

The DSIL suits investment projects of a certain scale with a clear link to a statutory priority: energy renovation of a school complex, bringing a public facility up to standard, mobility infrastructure, a facility made necessary by population growth. It remains accessible to urban municipalities that the DETR excludes. Regional selection is tight and the average rate observed remains low: for CHOICE, the DSIL should be treated as co-funding to be secured, not as the pillar of the financing plan. The project filed must be mature and backed by a council resolution, the minimum 20% contribution must be respected, the budget timetable must allow for an assessment period that the national platform estimates at between 8 and 12 months, and no expenditure may be committed before filing.

How to prepare your project

As the form is common to the DETR and the DSIL, the deadlines found on 6 November 2026 on the departmental prefectures' websites apply to both grants:

  • Cher: to be confirmed; the prefecture's page still presents the 2026 round.
  • Eure-et-Loir: to be confirmed; for 2026, the deadline was 16 January 2026.
  • Indre: to be confirmed; the latest publications concern 2026.
  • Indre-et-Loire: to be confirmed; for 2026, filing was open until 31 December 2025.
  • Loir-et-Cher: 18 December 2026 at 23:59.
  • Loiret: to be confirmed; for 2026, the deadline was 1 December 2025.

Steps:

  • Identify the statutory priority to which the project relates and frame it accordingly in the explanatory note.
  • Gather the common documents: explanatory note, provisional financing plan, detailed quote excluding VAT, timetable, certificate of non-commencement; for works, the legal status of the land, location and site plans, the detailed programme and the preliminary design where applicable.
  • Have the deliberative body vote on the operation and its financing plan before notification.
  • File on Démarche numérique (the government's online application platform): the application is assessed by the departmental prefecture and passed to the regional prefect, who awards the grant.
  • In Loir-et-Cher, an application filed for 2026 and not selected is carried over to 2027 by simple written confirmation; assessment is handled by the prefecture's territorial cohesion and planning office and by the sub-prefectures of Romorantin-Lanthenay and Vendôme.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.