← All publications

Public authorities

French State: rural infrastructure grant (DETR)

Fund investment by rural municipalities and intermunicipal bodies, according to the priorities set in each department.

Status
Open
Next deadline
Varies by department; Loir-et-Cher: 18 December 2026 at 23:59 (2027 funding round)
Operator
French State (departmental prefectures)

At a glance

Programme
Rural infrastructure grant (DETR, dotation d'équipement des territoires ruraux), Articles L. 2334-32 et seq. of the CGCT
Territory
France (national)
Beneficiaries
Municipalities and EPCIs with their own tax-raising powers that meet the population and wealth criteria, some syndicates; list sent to prefectures each year
Type of aid
Investment grant
Amount / rate
20% to 80% of eligible expenditure, with ranges set for each category by the departmental committee of elected officials
Availability
Filing on Démarche numérique; 2027 call published in Loir-et-Cher (18 December 2026), to be confirmed in the other five departments of Centre-Val de Loire

The rural infrastructure grant (DETR, dotation d'équipement des territoires ruraux) supports investment projects by municipalities and their groupings in rural areas. It is awarded by the departmental prefect, according to categories of operations and rate ranges set each year by a departmental committee of elected officials. As of 6 November 2026, according to their websites, the Loir-et-Cher prefecture is the only one in Centre-Val de Loire to have published its 2027 call for projects: filing until 18 December 2026 at 23:59.

Which projects are funded?

DETR funding covers investment, as well as projects in the economic, social, environmental, sports and tourism fields or that help develop or maintain public services in rural areas. Priorities vary from one department to another. The national fact sheet cites, among others:

  • the renovation of sports facilities;
  • the creation of a footpath or a cycle lane;
  • the thermal renovation of a school or the construction of a school building;
  • bringing fire-fighting water supplies up to standard;
  • the installation of a video surveillance system;
  • making buildings open to the public accessible;
  • road works.

In Loir-et-Cher, the committee of elected officials has selected eight categories for 2027: early childhood, schools and social cohesion; revitalisation of small-town and village centres; facilities for Travellers; new technologies; economic and tourism development; services to the public in rural areas; environment and sustainable development; safety.

Who can apply?

  • Municipalities with no more than 2,000 inhabitants in mainland France (3,500 overseas).
  • Municipalities with more than 2,000 and no more than 20,000 inhabitants in mainland France (3,500 to 35,000 overseas) whose financial potential per inhabitant is less than 1.3 times the average for municipalities in that size band. The population used for municipalities is the DGF population (the figure used to calculate the State's general operating grant).
  • EPCIs (intermunicipal bodies) with their own tax-raising powers, except those forming a single contiguous area without enclaves of more than 75,000 inhabitants around one or more central municipalities of more than 20,000 inhabitants, with a density of at least 150 inhabitants per square kilometre (thresholds of 150,000 and 85,000 inhabitants overseas). The population used is the figure from INSEE (the national statistics institute).
  • By way of exception, EPCIs that were eligible in 2010 for the municipal capital grant (DGE des communes) or the rural development grant (DDR), as well as mixed syndicates made up of municipalities and EPCIs and syndicates of municipalities with no more than 60,000 inhabitants.
  • The municipalities of Saint-Pierre-et-Miquelon, and new municipalities (communes nouvelles) formed from an eligible EPCI or municipality, during their first three financial years.
  • Where the grant forms part of a contract signed with the State's representative, the project owners designated by that contract.

Municipalities above these population or financial potential thresholds and EPCIs that do not meet the conditions are excluded; departments and regions are not among the beneficiaries. Each year the DGCL (directorate general for local authorities) sends the prefectures the list of eligible municipalities and EPCIs: eligibility is checked with the departmental prefecture.

Which costs are eligible?

The DETR funds capital expenditure, for projects at the design stage as well as at the delivery stage. The project must fall within the remit of the local authority carrying it, and only one project owner may apply for the grant.

The 2027 guide of the Loir-et-Cher prefecture sets out rules that may differ elsewhere:

  • only projects of more than €6,000 excluding VAT are eligible, except in the "new technologies" category;
  • expenditure is assessed excluding VAT, on the basis of precise, priced estimates;
  • a property acquisition is only subsidised if combined with works, with a specified use;
  • the following, among others, are not eligible: studies alone, the purchase of vehicles, minor road maintenance repairs, the creation of car parks outside an overall project with a mobility component, the replacement of school IT equipment, oil or gas heating, photovoltaics other than for full self-consumption, insurance, bailiff and reprographics costs, in-house labour and price revisions.

Certain specific State grants, listed in Appendix VII of the CGCT (French General Local Authorities Code), cannot be combined with the DETR and lead to the automatic rejection of the application.

How much funding is available?

The DETR is a grant whose rate ranges from 20% to 80% according to the national fact sheet. The departmental committee of elected officials sets the minimum and maximum rates for each category and gives its opinion on any proposed grant of more than €100,000.

In Loir-et-Cher, for 2027:

  • 20% to 50% for most categories;
  • 20% to 60% for environment and sustainable development, and for safety;
  • 20% to 80% for facilities for Travellers;
  • up to 80% for safety and accessibility works in existing buildings, France services centres (local public service hubs) and the inclusion of children with disabilities.

The local authority must retain a minimum contribution of 20% of public funding (Article L. 1111-10 of the CGCT). As a benchmark, the DGCL's 2025 national review reports 16,799 projects supported, an average grant of €59,518 and an average rate of 19.4%.

Main selection criteria

For 2027, the Loir-et-Cher guide highlights:

  • the maturity of the application, in form and in substance, with priced quotes excluding VAT;
  • a requested rate within the category's range and a financing plan sought from all partners;
  • inclusion in a contract or a territorial project, and structuring or jointly planned projects benefiting several local authorities;
  • an assessment of the expected gains (societal, environmental, economic, health);
  • environmental objectives: reduction of greenhouse gas emissions, biodiversity, economical use of land, energy renovation, soil permeability, water management;
  • compliance with recommendations on health-promoting urban planning.

A local authority filing several applications must rank them in order of priority.

Points to watch

  • No start of execution (signed quote, purchase order, signed tender commitment) is allowed before filing, unless authorisation has been requested beforehand (Article R. 2334-24 of the CGCT); the national form even asks applicants not to start before the application has been declared or deemed complete: apply the stricter rule and check it with the prefecture.
  • No supplementary request is possible for the same project: the estimate must be complete at filing.
  • The DETR is reserved for eligible rural municipalities and EPCIs and awarded by the departmental prefect on the categories set by the committee of elected officials, whereas the DSIL (local investment support grant), open to all municipalities, EPCIs with their own tax-raising powers and PETRs (rural and territorial balance hubs), is awarded by the regional prefect on six priorities set by law.
  • Unlike the Fonds vert (the French Green Fund), whose catalogue includes in particular the remediation of brownfield sites from former ICPE (classified installations for environmental protection) or mining sites, the DETR is a general-purpose grant: in Loir-et-Cher, projects eligible for more specialised funding, including the Fonds vert, are normally redirected to it, and as a general rule the financing plan must not rely on combining State grants.
  • The operation must start within two years of notification (one-year extension possible) and be completed within four years of its start (extension of two years at most).
  • The obligations to display and publicise the State's support are a condition for payment of the grant.

The CHOICE view

The DETR suits local investments by a rural municipality or intermunicipal body: a school, a sports facility, accessibility, thermal renovation, road safety. The average rate observed nationally remains close to 20%: a prudent financing plan is not built on the category ceiling. For CHOICE, the key is to file a mature project (preliminary design, quotes excluding VAT, timetable), backed by a council resolution, with a financing plan that respects the minimum 20% contribution, and to allow in the budget timetable for an assessment period that the national platform estimates at between 8 and 12 months, without committing any expenditure before filing.

How to prepare your project

Filing deadlines for the 2027 funding round in Centre-Val de Loire, as found on 6 November 2026 on the prefectures' websites:

  • Cher: to be confirmed; the prefecture's page still presents the 2026 round.
  • Eure-et-Loir: to be confirmed; for 2026, the deadline was 16 January 2026.
  • Indre: to be confirmed; the latest publications concern 2026.
  • Indre-et-Loire: to be confirmed; for 2026, filing was open until 31 December 2025.
  • Loir-et-Cher: 18 December 2026 at 23:59.
  • Loiret: to be confirmed; for 2026, the deadline was 1 December 2025.

Steps:

  • Check with the prefecture that the local authority is on the list of eligible beneficiaries.
  • Read the year's departmental rules or guide: categories, rates, documents specific to the department.
  • Gather the common documents: explanatory note, provisional financing plan, detailed quote excluding VAT, timetable, certificate of non-commencement; for works, the legal status of the land, location and site plans, the detailed programme and the preliminary design where applicable.
  • Have the deliberative body vote on the operation and its financing plan: in Loir-et-Cher, the resolution may follow filing but must precede notification.
  • File on Démarche numérique (the government's online application platform), using the single DETR and DSIL form: the application is sent to the departmental prefect; in Loir-et-Cher, the prefecture then directs the application to the most appropriate grant.
  • In Loir-et-Cher, an application filed for 2026 and not selected is carried over to 2027 by simple written confirmation; assessment is handled by the prefecture's territorial cohesion and planning office and by the sub-prefectures of Romorantin-Lanthenay and Vendôme.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.