Fonds vert: renaturation of towns and villages

Fund nature-based solutions that cool urbanised areas and improve stormwater management there.

Status
Open
Next deadline
31 December 2026 at 23:59 (online filing)
Operator
French State (regional prefects) / water agencies

At a glance

Programme
Fonds vert 2026, pillar 2 (Adapting areas to climate change)
Territory
France (national)
Beneficiaries
Local authorities and groupings, local public bodies (SEM, SPL) and State public bodies, social landlords
Type of aid
Grant: diagnostic and strategy studies, engineering and preliminary studies, investment
Amount / rate
Up to 80% according to Aides-territoires; minimum contribution of 20% from the beneficiary; national average rate of 25% across the whole Fonds vert
Availability
Open since 7 April 2026; online filing until 31 December 2026 at 23:59 (Paris time); recurring aid

Information up to date as of 6 November 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

In 2026, the Fonds vert (the French Green Fund) funds the return or creation of natural spaces in urbanised areas, to reduce their exposure to heatwaves, flooding and pollution. It supports diagnostic and strategy studies as well as the design and works of nature-based solutions: de-sealing, greening, bringing water back into the city. Applications are filed online on Démarche numérique (the government's online application platform) until 31 December 2026 at 23:59 (Paris time).

Which projects are funded?

Eligible renaturation projects are those that:

  • preserve or recreate natural spaces while improving their ecological functions;
  • are located within or adjoining an urbanised area;
  • adapt the site and its surroundings to climate change impacts for which a vulnerability has been identified locally, in particular through urban cooling or integrated stormwater management.

The actions must contribute directly to:

  • the renaturation of urban soils and spaces: creation or restoration of living soils, de-sealing, open-ground planted and tree-lined landscaping;
  • the presence of water in the city: reopening or renaturation of watercourses, re-meandering, bank reprofiling, wetlands, flood expansion areas, swales and stormwater infiltration areas;
  • the greening of public spaces: urban parks, forests and gardens, tree lines and tree pits, urban agriculture that benefits biodiversity;
  • the greening of buildings: roofs and façades.

Renaturation must first strengthen the ecological functionality of the site: greening is only viable if it also addresses soils and water supply, over its entire life cycle. Projects that incorporate artificial intelligence, for example to identify and prioritise the areas to be renatured, are also eligible. Aides-territoires (the government's aid platform for local areas) cites among typical projects school playgrounds, shared gardens or the greening of a cemetery.

Who can apply?

The project holder is the project owner, subject to compliance with European State aid rules:

  • local authorities and their groupings;
  • local public bodies, in particular semi-public companies and local public companies;
  • State public bodies, in particular public development bodies, the Conservatoire du littoral and Voies navigables de France;
  • social landlords.

Concession holders, delegates and agents may file an application with the formal agreement of the local authority or public body concerned. Joint project ownership with a partner, in particular a public land agency, is possible. Aides-territoires also mentions associations and companies, for a project of general interest explicitly supported by the local authority competent for planning and development; the April 2026 guidance handbook does not mention them: to be confirmed with the assessing service.

The measure covers mainland France, the overseas departments and regions and the overseas collectivities.

Not eligible:

  • the renaturation of natural, agricultural or forest land located outside the urban envelope;
  • operations merely for regulatory compliance, such as environmental offsetting or prescribed site restoration, except for the part that goes beyond the obligation.

Which costs are eligible?

  • Territorial diagnostic studies and climate resilience and renaturation strategy studies, within the framework of planning and urban planning documents (SRADDET, SCOT, PLU-i, municipal maps, PCAET, SAGE, PAPI, etc.) or of urban programming at the scale of a block, a neighbourhood or an area, including urban heat island diagnostics.
  • Engineering and studies prior to the design of nature-based solutions, as well as their evaluation over time.
  • Implementation investment, subject to guarantees of maturity: clear objectives, land control strategy, development operator and maintenance manager identified, full cost anticipated.

Expenditure that accompanies renaturation without strengthening ecological functions is not eligible: street furniture, paths, equipment.

How much funding is available?

The aid is a grant. Aides-territoires shows a maximum rate of 80%, and the guidance handbook requires the beneficiary to make a minimum contribution of 20% to the funding of the project (Article L. 1111-10 of the General Local Authorities Code, CGCT, where a local authority is the project owner). It does not publish a scale: the amount is set operation by operation according to:

  • the ecological ambition of the project;
  • the project holder's capacity to contribute;
  • the socio-economic fragility of the area (unemployment, demographics, vacancy, poverty, priority neighbourhood status, etc.);
  • operational constraints: market pressure, difficulty of land acquisition, regulatory authorisations;
  • the exemplary nature of the project, including in terms of employment and consultation.

As a benchmark, the handbook indicates a national average grant rate of 25% across the whole Fonds vert. Payment is made on proof of expenditure: advance of up to 15% at the start, interim payments up to 80% of the provisional amount, balance on invoices and completion report. By way of example, Aides-territoires cites a grant of €335,656 awarded in 2024 in Deux-Sèvres to renature town-centre squares in a priority neighbourhood, with 1 ha de-sealed and more than 8,000 m² planted.

Main selection criteria

The first criterion is the project's contribution to climate change adaptation:

  • scale of the hazards (heat island, drought, flooding) and vulnerability of the area;
  • effectiveness of the solutions chosen for urban cooling or hydraulic regulation, plant species suited to the context;
  • durability: functions adapted to the future climate, long-term ecological management, reproducible solutions.

Also taken into account are:

  • environmental and landscape qualities, with attention to multifunctional projects, soil renaturation and the landscape approach;
  • social and territorial vulnerability, with priority given to priority neighbourhoods undergoing urban renewal;
  • qualities of use, with priority for the playgrounds, façades and surroundings of schools;
  • the quality of the process: governance, co-design with residents, evaluation over time;
  • integration into planning documents: biotope coefficient, green and blue corridors, zero net artificialisation objective, stormwater management at source;
  • inclusion in a territorial programme or a sustainable development approach: Action Cœur de Ville, Petites Villes de Demain, territorial revitalisation operation, Territoires engagés pour la nature, EcoQuartier, among others.

Points to watch

  • The online filing deadline is 31 December 2026 at 23:59 (Paris time). The filing page estimates the assessment period at 4 months at best, at around 5 months if the application requires some exchanges, and at more than a year for an incomplete application.
  • Execution cannot start before filing on Démarche numérique; the acknowledgement of receipt allows works to be launched, without prejudging the aid. Aides-territoires mentions an exception in case of emergency, which the handbook does not include.
  • Assessment involves several levels: the water agency assesses with the State services, the departmental prefect gives an opinion on suitability, the regional prefect validates the programming. Contracting takes the form of a letter from the regional prefect and a notification from the water agency (agreement or award decision overseas).
  • The application must qualify the local climate hazard and show that the solution is sized to address it: ornamental greening is not enough.
  • The introduction of invasive exotic plants is prohibited, and water and fertile soil requirements must be anticipated.
  • To be distinguished from the ADEME "Brownfield remediation" fact sheet of the Fonds vert, which funds the management of pollution on former ICPE (classified installations for environmental protection) or mining sites with a view to their conversion: this measure funds nature-based solutions in urbanised areas, and the handbook provides that it can be coordinated with the land recycling aid.
  • Combinations with other State funding are excluded as far as possible.

The CHOICE view

The measure suits local authorities that have a specific site and a documented climate problem: heat island, runoff, river overflow. A beautification project, or one dominated by street furniture and paths, has little place here; ecological functions and an adaptation gain must be demonstrated. School playgrounds, priority neighbourhoods and projects forming part of a territorial programme are prioritised, with no guarantee of award. What needs to be secured: land control, the long-term maintenance manager and budget, a resolution on the operation and a financing plan that leaves at least 20% to be borne by the project holder, coordination with other Fonds vert aid, and filing before any start. Assessment goes through the water agency and then through regional programming: with less than two months to go before the 31 December 2026 deadline, a prompt discussion with State services helps to calibrate a complete application first time. The handbook carried 2025 applications that had not been assessed over to the 2026 financial year, but the sources consulted do not say what will happen to 2026 applications that are not assessed in time.

How to prepare your project

  • Qualify the local climate hazard and the vulnerability of the site: scale, extent, exposed assets, impact without the project. The handbook suggests the IUCN standard for nature-based solutions as a reference.
  • Describe the expected ecological functions, their benefits and their scale, and justify the sizing over the long term.
  • Discuss with State services before filing, as the handbook recommends: the State's website in the department, district sub-prefect, departmental directorate for territories (and the sea), or State services overseas.
  • Gather the documents: technical description with provisional timetable and summary description of eligible expenditure (areas, technique); provisional financing plan, if possible with the estimated quantity breakdown or the breakdown of the global lump-sum price; bank details (RIB); for works, view of the existing state, project plan and cross-sections showing the natural spaces gained; monitoring and evaluation arrangements, with indicators before, during and after the project.
  • Check the list on the filing page: presentation file, detailed provisional financial statement and bank details in all cases; depending on the situation, resolution of the deliberative body, preliminary study or studies, technical file, land control document for the areas to be renatured, stormwater flow diagram, VAT certificate or note, formal agreement of the local authority and documents of the joint project holder where applicable.
  • File the application on Démarche numérique, accessible from the measure's Aides-territoires page, before any start of execution and by 31 December 2026 at 23:59 (Paris time) at the latest.
  • An application filed in 2025 and not assessed does not need to be refiled: it is carried over to 2026 and the project holder receives an email from the platform to complete it.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.