Fonds vert: energy renovation of local public buildings

Fund the energy renovation and adaptation to extreme heat of buildings owned by local authorities.

Status
Open
Next deadline
31 December 2026 at 23:59 (online filing)
Operator
French State (departmental prefectures)

At a glance

Programme
Fonds vert 2026, pillar 1 (Strengthening environmental performance)
Territory
France (national)
Beneficiaries
Local authorities and their groupings within the meaning of the CGCT, for their own buildings; social landlords and SEMs excluded
Type of aid
Investment grant, including engineering linked to the works programme
Amount / rate
Up to 80% according to Aides-territoires; national average rate of 25% across the whole Fonds vert; amount set by the departmental prefect
Availability
Open since 7 April 2026; online filing until 31 December 2026 at 23:59 (Paris time); recurring aid

Information up to date as of 6 November 2026, valid until 31 December 2026. Scheme conditions change: check with the funding body or ask us for confirmation.

In 2026, the Fonds vert (the French Green Fund) supports works on buildings owned by local authorities and their groupings, through two entry points: an energy renovation that reduces final energy consumption by at least 40%, or works devoted solely to summer comfort. Revised in July 2026, the measure also funds, under conditions, high-performance active cooling systems, in particular in schools. Applications are filed online on Démarche numérique (the government's online application platform) until 31 December 2026 at 23:59 (Paris time).

Which projects are funded?

The measure covers existing buildings, whatever their use: town halls, schools, sports halls, public facilities. New construction and demolition-reconstruction operations are excluded.

Energy renovation strand. In mainland France, the project must reduce final energy consumption by at least 40% across the five regulated uses (heating, cooling, domestic hot water, lighting, auxiliaries), with a significant reduction in greenhouse gas emissions. These gains are certified by a thermal study. The project must also demonstrate that summer comfort has been taken into account: presence or installation of external solar protection on the windows of exposed façades.

  • Exclusively residential building: the criterion becomes reaching the "BBC rénovation 2024" low-energy building level (first stage) or class C of the DPE (energy performance certificate).
  • Overseas, excluding Saint-Pierre-et-Miquelon: at least two measures, one on the envelope, the other on equipment, certified by an energy assessment.
  • Saint-Pierre-et-Miquelon: at least 30% final energy savings.

Summer comfort only strand. Works that protect the building from extreme heat with no or very little energy consumption: sun shades, ventilated cladding, external solar protection for windows, night ventilation grilles, air circulators, floor cooling. In schools, an air-to-air heat pump may equip a cooled room. If the windows are not already protected, the project must include external solar protection. This strand does not require a thermal study: Aides-territoires (the government's aid platform for local areas) presents it as a "fast-track application". Overseas, it requires at least two measures (protection of the building against radiation, natural ventilation, ceiling fans).

Within the perimeter of a flood risk prevention plan, the works must be consistent with its vulnerability reduction requirements.

Who can apply?

  • Local authorities and their groupings within the meaning of the General Local Authorities Code (CGCT): municipalities, intermunicipal bodies, departments, regions. The frequently asked questions cite communities of municipalities and energy syndicates among eligible project holders.
  • The building must belong to the project holder.
  • Areas covered: mainland France, overseas departments and regions, overseas collectivities. Aides-territoires adds New Caledonia, which the guidance handbook does not mention: to be confirmed with State services.

Excluded:

  • social landlords;
  • semi-public companies and local public enterprises.

For housing under an APL (housing benefit) agreement owned by a local authority, the frequently asked questions ask for social rental housing aid to be mobilised first.

Which costs are eligible?

Works:

  • insulation of the envelope: walls, lower floors, roof, external joinery;
  • replacement of heating and domestic hot water with high-performance equipment, possibly reversible (heat pump, geothermal energy), and emitters compatible with cooling;
  • passive summer comfort works, high-performance lighting, economical and high-performance ventilation, active control and management devices;
  • related works: consequential works, asbestos removal, reorganisation of premises, equipment that reduces water consumption;
  • photovoltaic panels, only for self-consumption without injection into the grid and as part of a renovation project.

Engineering directly necessary for the works programme:

  • preliminary studies: building stock diagnosis, works plan, thermal study or energy assessment;
  • project management and project owner assistance (operation management, SPS health and safety coordination, technical inspection).

Not eligible are the installation of oil- or coal-fired boilers, or a heating system in which gas boilers cover more than 30% of needs (a hybrid system running on at least 70% renewable energy remains possible). The measure does not fund studies alone.

How much funding is available?

The aid is a grant. Aides-territoires shows a maximum rate of 80%. The guidance handbook does not publish a scale: the departmental prefect sets the amount project by project, taking into account:

  • the ecological ambition and exemplary nature of the project;
  • the project holder's capacity to contribute, with flexibility for small rural municipalities;
  • the socio-economic fragility of the area;
  • the operational constraints of the project.

As a benchmark, the handbook indicates a national average grant rate of 25% across the whole Fonds vert. The local authority acting as project owner provides a minimum contribution of 20% of total public funding (Article L. 1111-10 of the CGCT), a rate that may be brought down to 10% for the energy renovation of a school.

Payment is made on proof of expenditure: advance of up to 15% at the start, interim payments up to 80% of the provisional amount, balance on invoices and completion report. By way of example, Aides-territoires cites a grant of €338,000 awarded in 2024 to a municipality in Ille-et-Vilaine for the comprehensive renovation of a school.

Main selection criteria

For energy renovation, the first criterion is the project's ambition in terms of energy savings and emission reductions, expressed as a percentage. Priority is then given to projects that:

  • meet the exemplary targets of the European Energy Efficiency Directive (BBC Rénovation 2024 level or its first stage for residential buildings, BBC Rénovation Tertiaire for tertiary buildings);
  • improve the building envelope first, for winter as well as summer comfort;
  • completely eliminate fossil fuels in favour of renewable and recovered energy, with geothermal energy preferred;
  • use reused or bio-based materials;
  • concern primary schools, in particular in priority urban policy neighbourhoods;
  • form part of an ecological transition contract (CRTE) or a property programme.

Particular attention may be paid to small rural municipalities. For the summer comfort strand, priority goes to projects that address all aspects of the building's external protection and to schools.

Points to watch

  • The online filing deadline is 31 December 2026 at 23:59 (Paris time). The guide attached to the filing page is version 4.1 of the handbook; the version revised in July 2026 (4.2) is the one published on ecologie.gouv.fr.
  • Execution cannot start before filing on Démarche numérique, except in a proven emergency. The acknowledgement of receipt allows works to be launched, without prejudging the aid. Only preliminary studies may be commissioned before filing.
  • The thermal study is a mandatory document for the renovation strand: a document that does not contain everything required by Annex 2 of the handbook does not replace it, and the gain is calculated without deducting self-consumed photovoltaics.
  • Combination: energy savings certificates (CEE) and the ADEME Fonds chaleur (renewable heat fund) are to be mobilised first. Combination with standardised CEE operations is possible, it is excluded with a CEE programme such as ACTEE for the same action, and combinations with other State funding are excluded as far as possible.
  • Feasibility studies for renewable heat fall under the Fonds chaleur; the frequently asked questions place energy audits among the projects of the Fonds vert's cross-cutting "Engineering" measure.
  • A building located within the priority perimeter of a classified heating network must be connected to it when its heating is replaced above a certain output.
  • Protected birds and bats may occupy the building: works must comply with Articles L. 411-1 and L. 411-2 of the Environment Code.
  • The beneficiary local authority publishes and displays its financing plan during and after the operation, indicating the State's contribution.

The CHOICE view

The measure suits local authorities that have an identified building, a thermal study in hand and a programme that addresses the envelope first: it is the quantified ambition that determines priority, and schools, projects that move away from fossil fuels and those included in the CRTE start with an advantage, with no guarantee of award. For a municipality with limited engineering capacity, the summer comfort strand, without a thermal study, makes it possible to deal quickly with a building exposed to extreme heat. What needs to be secured: filing before any work order, a resolution on the operation and its financing plan, the split between CEE, Fonds chaleur and Fonds vert, and the entry of the appropriations in the budget. With less than two months to go before the 31 December 2026 deadline, it is better to file early and contact the DDT(M) (departmental directorate for territories and the sea): the handbook carried 2025 applications that had not been assessed over to the 2026 financial year, but the sources consulted do not say what will happen to 2026 applications that are not assessed in time.

How to prepare your project

  • Contact State services before filing, as the handbook recommends: the State's website in the department, district sub-prefect, departmental directorate for territories (and the sea), or State services overseas.
  • Choose the strand: energy renovation, with a thermal study compliant with Annex 2 of the handbook (energy assessment overseas), or summer comfort only, with a description of the initial state and existing protections.
  • Have the thermal study carried out by a qualified person: a design office with OPQIBI 1905 qualification or equivalent, an energy manager, or a qualified in-house officer of the local authority.
  • Gather the documents: technical description and provisional timetable, provisional financing plan indicating the other aid requested or obtained, bank details (RIB).
  • File the application on Démarche numérique, accessible from the measure's Aides-territoires page, before any start of execution and by 31 December 2026 at 23:59 (Paris time) at the latest. The departmental prefect selects the projects and sets the amount after assessment by the DDT(M), the prefecture or the sub-prefecture.
  • An application filed in 2025 and not assessed does not need to be refiled: it is carried over to 2026 and the project holder receives an email from the platform to complete it.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.