Fund the disconnection of stormwater from collection networks and its infiltration into mainly vegetated features.

Status
Open
Next deadline
No deadline published (timetable displayed until 31 December 2030)
Operator
Agence de l'eau Loire-Bretagne

At a glance

Programme
Agence de l'eau Loire-Bretagne funding
Territory
Loire-Bretagne basin
Beneficiaries
Municipalities, intermunicipal bodies, departments, regions, local public companies (Sem, Spl, SemOp)
Type of aid
Grant
Amount / rate
Maximum rate of 50%; amount per project to be confirmed with the agency
Availability
Timetable displayed from 1 January 2025 to 31 December 2030; no submission deadline published

The Agence de l'eau Loire-Bretagne (the Loire-Bretagne Water Agency) supports works that disconnect stormwater from collection networks so that it infiltrates into the soil, as close as possible to where it falls, on features that are not dedicated solely to water. This scheme concerns projects in which stormwater is managed mainly on vegetated features. The aid is a grant of up to 50%.

Which projects are funded?

Works to disconnect stormwater from collection networks, for infiltration into the soil on mainly vegetated features. The source cites, among others, these types of feature:

  • Sunken green spaces.
  • Green storage roof connected to an infiltration device.
  • Permeable pavement or roadway on a storage and infiltration structure.
  • Infiltration trench.

Vegetated open-ground solutions, which are more sustainable and bring co-benefits (restoring biodiversity, combating heat islands, quality of life), will be given priority.

Who can apply?

  • Municipalities.
  • Intermunicipal bodies (the "Intercommunalité / Pays" category on Aides-territoires, the French government's directory of funding for local projects).
  • Departments.
  • Regions.
  • Local public companies (Sem, Spl, SemOp).

The project must be located in the Loire-Bretagne basin. The source cites no other beneficiary and states no explicit exclusion.

Which costs are eligible?

Only capital expenditure is mentioned by the source, for the disconnection and infiltration works. The listing accepts projects at the thinking or design stage as well as at the implementation stage.

How much funding is available?

The aid takes the form of a grant, at a maximum rate of 50% according to Aides-territoires. The source gives no minimum rate, no expenditure ceiling and no amount per project: these details are to be confirmed with the water agency.

Main selection criteria

The listing sets out eligibility conditions rather than a selection grid:

  • A hydraulic study complying with the water agency's technical recommendations, with levelling plans showing the networks and the flow of stormwater before and after the works.
  • Sizing for heavy rainfall: infiltration features must be able to store temporarily, while it infiltrates, at least 35 litres of water per m² disconnected from the networks.
  • Stormwater management mainly on vegetated features, with a preference for open ground.

Points to watch

  • Whether the features are mainly vegetated determines the scheme: features that are not fall under another agency aid, "Infiltrer des eaux pluviales urbaines (autres travaux)" (infiltrating urban stormwater, other works), whose displayed maximum rate is 25%.
  • Decision-support studies are covered by a separate agency aid, "Accompagner les études d'aide à la décision pour infiltrer les eaux pluviales" (supporting decision-support studies for stormwater infiltration).
  • The threshold of 35 litres per m² disconnected must be checked from the design stage, as it determines the sizing of the structures.
  • A measure of the Fonds vert (the French Green Fund), "Renaturation des villes et des villages" (renaturing towns and villages), also funds renaturation in urban areas, including the creation of swales and stormwater infiltration areas: check with the assessing services how the two aids fit together on the same project.
  • The date of 31 December 2030 displayed by Aides-territoires is not presented as a submission deadline.

The CHOICE view

This aid suits projects to redevelop public spaces, roads or the surroundings of facilities that disconnect surfaces from the network and can entrust most of the water management to vegetated spaces. The decisive point is technical: the hydraulic study, the levelling plans and the storage calculation must be robust before submission, and the vegetated share must remain the majority so as not to tip over to a lower rate. On the local authority side, the council resolution, the financing plan, any combination with the Fonds vert and the budget timetable must be secured, and the agency's rules on starting works must be checked before any commitment, without taking the maximum rate for granted.

How to prepare your project

  • Commission the hydraulic study in line with the water agency's technical recommendations, with levelling plans before and after the works.
  • Measure the disconnected surfaces and size the temporary storage at no less than 35 litres per m².
  • Show that stormwater is managed mainly on vegetated features, giving priority to open ground.
  • Prepare the council resolution and the financing plan, listing the other aid applied for.
  • Contact the Agence de l'eau Loire-Bretagne before finalising the project.
  • Submit the application via the water agency's online aid application service, to which the "Candidater" (apply) button on Aides-territoires leads.

Official sources

The conditions of a scheme can change. This fact sheet was checked on the date shown; only the call specifications, the official texts and the funding body's decision are authoritative.

How CHOICE works on this kind of application

Finding the right scheme is only one step. What matters happens before: clarifying the project, gathering the expected evidence, bringing in the right partners and sequencing commitments.